CPM Buidling Solutions built a new locker room, staff entrance to warehouse, as well as other associated works for ASOS. 

Works were cordoned off using a crowd barrier to allow safe working conditions, A New locker room was formed with a jumbo stud partition wall approx. 12.5 meters long to divide the locker room, complete with 2 new oak door at each end complete with vision panels, the existing floor tiles were removed and fully screeded, to allow new ceramic floor tiles to be installed, the architraves & skirting were replaced & walls decorated to match the existing look. There was also new steps to be formed that lead to the shop floor, extending the original complete with hand rails.

Start date: 26/07/2016
Completion Date: 04/10/2016
Working days on site: 50


 

Vico Homes - Lumley and Lightfoot - Grinding and Pointing Scheme project photograph

Rejoining the server...

Rejoin failed... trying again in seconds.

Failed to rejoin.
Please retry or reload the page.

The session has been paused by the server.

Failed to resume the session.
Please retry or reload the page.